|
Minimum Spectrum Demand per Public Terrestrial UMTS Operator in the Initial Phase (Table of Contents) |
|
UMTS Forum Report 5, 1998
Table of Contents
0. 1 0.1 0.2 2 2.1 2.2 2.3 2.4 3 3.1 3.2 3.3 3.4 3.5 3.6 4 4.1 4.2 4.3 5 5.1 5.2 5.3 5.4 5.5 5.6 5.7 6 6.1 6.2 6.3 7 |
Executive Summary Introduction Report Structure General Assumptions Market forecasts for UMTS Services Symmetric and Asymmetric Spectrum use Service classes and switching modes Assumptions for the UMTS Market Traffic capacity requirements in urban environments World-wide spectrum availability European Spectrum for UMTS Asia/Pacific North America South America African and Arabian States Other Regions Minimum Spectrum per Operator from a technical point of view Technical Assumptions Spectrum Allocation and Deployment Scenarios Viability of scenarios Minimum Spectrum per Operator - an overall view and a feasibility study Scenario 1: Scenarios 2 and 3: Scenario 4: Scenario 5: Scenario 6: Scenario 7 and 8: Summary Conclusions European Situation World wide situation Recommendations References and Bibliography |
Annexes: 1. Full and low mobility use in the selected environments 2. Methodology to evaluate spectrum allocation scenarios
|